Works on the rehabilitation of the ecological landfill “Maljevac”
Execution of construction works on the stabilization of the Maljevac dam
Execution of preparatory works, works on excavations and embankments, concrete and reinforced concrete works, drainage works, works on sealing joints and making gabions.
- Total excavations: 71.415,09 m3
- Total embankment: 485.702,99 m3
- Quantity of concrete works: 1.773,67 m3
Investor:
EPCG AD Nikšić
Status:
Finished
Year:
2013 – 2015
Value of contracted works:
8.500.000 €