Works on the reconstruction of the regional road Kolašin – Mateševo
The length of the road is about eight and a half kilometers, while on three sections with a total length of about 1.5 kilometers the existing elements of the situational road are being corrected, while on the rest of the road the existing road is being scraped and covered with a new wearing layer of asphalt.
The length of the road: 9 km
- Earthworks – Excavation: 123.478 m3 – done 100%
- Earthworks – Embankment: 5.718 m3 – done 100%
- Concrete and reinforced concrete works: 2.816 m3 – done 100%
- Asphalting works: 9.990 t – done 100%
Investor:
Uprava za saobraćaj
Status:
Finished
Year:
2023 – 2024
Value of contracted works:
6.500.000 €
MATEŠEVO – KOLAŠIN SLIDE REPAIR
Route length: 250 m
- Earthworks – Excavation: 4.306,00 m3 – done 100%
- Earthworks – Embankment: 990,5 m3 – done 100%
- Concrete and reinforced concrete works: 2.150,00 m3 – done 100%
- Asphalting works: 740,00 t – done 100%
Investor:
Uprava za saobraćaj
Status:
Finished
Year:
2023 – 2024
Value of contracted works:
1.500.000 €