Works on the reconstruction of the regional road Boan-Bukovica
Reconstruction of the regional road Boan-Bukovica, Section: Tušina-Bukovica (L ~ 11 km)
Execution of construction, construction-craft works on the reconstruction of the road, within which works on excavation of 64,307.67 m³ in material of all categories were performed and 20,788.12 m³ of embankment made of material of all categories were performed.
- Route length: 11,00 km
- Total excavations: 64.307,58 m3
- Total embankment: 29.387,25 m3
- Quantity of concrete works: 959,49 m3
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2010 – 2011
Value of contracted works:
1.500.000 €