Works on the reconstruction of the main road Ribarevina – Berane
Reconstruction of the main road Ribarevina – Berane, from km 1113 + 631 to km 115 + 200, construction of the tunnel “Tivran”
Execution of works on the route of the road, construction of a tunnel length L = 474.00 m, retaining walls, slab discounts, execution of electrical installation works.
- Route length: 1,57 km
- Total excavations: 32.711,50 m3
- Total embankment: 1.315,04 m3
- Quantity of concrete works: 7.371,00 m3
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2012 – 2014
Value of contracted works:
4.500.000 €