Works on the reconstruction of the main road Podgorica – Tuzi, PHASE II
Reconstruction of the main road Podgorica – Tuzi, from the turn for the cattle market to the bridge over the river Cijevna
The length of the road: 1,65 km
- Earthworks – Excavation: 33.191,68 m3 – done 100%
- Earthworks – Embankment: 21.946,81 m3 – done 100%
- Concrete and reinforced concrete works: 878,62 m3 – done 100%
- Asphalt works: 9.700 t – done 100%
Investor:
Uprava za saobraćaj
Status:
Finished
Year:
2019 – 2020
Value of contracted works:
2.500.000 €
U ovoj fazi izvodiće se radovi na kolovozu izgradnja četiri saobraćajne trake širine po tri i po metra, razdjelnom pojasu širine četiri metra, atmosferskoj kanalizaciji, vodovodu i javnoj rasvjeti.