Works on the reconstruction of the main road Podgorica – Tuzi, PHASE I

Reconstruction of the main road Podgorica – Tuzi, from the turn for cattle piacudo to the roundabout near the Fire Station in a length of 2.6 kilometers

The length of the road: 2,6 km

  • Earthworks – Excavation: 63.752,88 m3 – done 100%
  • Earthworks – Embankment: 37.526,74 m3 – done 100%
  • Concrete and reinforced concrete works: 3,625.97 m3 – done 100%
  • Asphalting works: 16.158,50 t – done 100%

Investor:

Uprava za saobraćaj

Status:

Finished

Year:

2022 – 2023

Value of contracted works:

6.500.000 €

In this phase, works will be carried out on the roadway, the construction of four three-and-a-half-meter wide traffic lanes, a four-meter-wide dividing strip, atmospheric sewage, water supply and public lighting.