Works on the reconstruction of the main road M-2, SECTION: Lepenac – Ribarevine – Poda – Berane
The reconstruction envisages the replacement of the pavement structure, the construction of retaining walls, the rehabilitation/reconstruction of slopes, bridges and tunnels, as well as the reconstruction of the intersection of road directions: Berane centar, Andrijevica and Aerodrom.
The length of the road: 39,8 km
- Earthworks – Excavation: 565.328,00 m3 – done 100%
- Earthworks – Embankment: 266.895,00 m3 – done 100%
- Concrete and reinforced concrete works: 60.095,00 m3 – done 100%
- Asphalting works: 56.577,00 t – done 100%
Investor:
Uprava za saobraćaj
Status:
Finished
Year:
2023 – 2025
Value of contracted works:
39.000.000 €