Works on the reconstruction of the main road M-2.3 Podgorica – Cetinje
Execution of works on the reconstruction of the main road M-2.3 Podgorica – Cetinje from km 7 + 300 to km 11 + 500, locality Barutana
Execution of construction and construction-craft works on: the route, pipe culverts, traffic signals and road equipment, as well as all geodetic works.
- Route length: 4,20 km
- Total excavations: 30.434,80 m3
- Total embankment: 3.865,24 m3
- Quantity of concrete works: 0
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2016
Value of contracted works:
1.500.000 €