Works on the reconstruction of the main road Bijelo Polje – Ribarevine
Bijelo Polje – Ribarevine bypass section, from 149 + 950.00 to 153 + 000
The length of the road: 3,12 km
Degree of completion of the object:
- Earthworks – Excavation: 24.182,71 m3 – done 100%
- Earthworks – Embankment: 3.748,69 m3 – done 100%
- Additional earthworks – Embankment: 2.500 m3 – done 100%
- Concrete and reinforced concrete works: 3.000 m3 – done 100%
- Asphalt works: 7.309,17 t – done 100%
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2019 – 2020
Value of contracted works:
3.000.000 €