Reconstruction works on the road M-2.4, section Krute – Vladimir – intersection for Ostros
Execution of works on the reconstruction of the road M-2.4, Krute – Vladimir – crossroads for Ostros
Execution of preparatory works, geodetic, works on the lower and upper machine, construction of tubular culverts Ø 1500 mm, L = 27 m, Ø 1000 mm, L = 17 m, Ø 800 mm, L = 274 m and Ø 500 mm, L = 12 m , AB of retaining walls, works on reconstruction of AB bridges and culverts, works on traffic signals and road equipment, observation of the building during construction.
- Route length: 4,8 km
- Total excavations: 34.876,70 m3
- Total embankment: 53.545,36 m3
- Quantity of concrete works: 1.119,58 m3
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2013
Value of contracted works:
3.000.000 €