Reconstruction works on the road Berane-Kolašin, section Lubnice-Jelovica
Reconstruction of the road Berane-Kolašin, section Lubnica-Jelovica
Execution of works on the construction of the Route “Lubnice-Jelovica” (km 10 + 321.910 to km 16 + 932.409), with the associated retaining walls and geotechnical structures, as well as works on the construction of slab culverts and works on the construction of the gallery (km 11 + 410 to km11 + 490), on the project of tunnel construction and road reconstruction on the section of the road Lubnica – Jezerine.
The length of the road: 6,61 km
Degree of completion of the object:
- Earthworks – Excavation: 221.734 m3 – done 100%
- Earthworks – Embankment: 25.297 m3 – done 100%
- Concrete and reinforced concrete works: 10.557 m3 – done 100%
- Additional concrete and reinforced concrete works: 1.060 m3 – done 100%
- Asphalt works: 11.462 t – done 100%
Investor:
EURO-ASFALT d.o.o. Sarajevo, Ogranak (part of a foreign society) Podgorica
Status:
Finished
Year:
2017 – 2021
Value of contracted works:
6.000.000 €