Reconstruction works on the regional road R13 Bioče – Mateševo - Kolašin (from the Mateševo loop to the Mateševo settlement)
The length of the road: 1,6 km
- Earthworks – Excavation: 30.846 m3 – done 100%
- Earthworks – Embankment: 52.953 m3 – done 100%
Two bridges are being built: Tara (586 meters long) and Drcka (72 meters)
Investor:
Monteput d.o.o.
Status:
Finished
Year:
2022
Value of contracted works:
5.500.000 €
The reconstruction consists of the construction of two new bridges – one over the Tara River and the other over the Drcka River. As for the bridge on the river Tara, it is 56 meters long with two spans of 28 meters and the middle pillar is 8.1 meters high. The bridge is based on piles with a diameter of 1.2 to 1.5 meters, and their length varies from 17 to 28 meters
As for the Drcka bridge, it is one span larger than the bridge on Tara, and is 72 meters long, two spans are 22 meters long, the third is 28 meters long, and the height of the highest pillar is 8.6 meters. That bridge is also based on piles, also with a diameter of 1.2 to 1.5 meters, with the greatest length of piles on this bridge being 27 meters.
We have works on reinforced concrete and gravity support walls, works on drainage, works on protection of slopes, as well as works on the road construction and traffic signals.