Reconstruction works on the regional road R-10, section Tomaševo – Pavino polje

Reconstruction of the regional road R-10, Section Tomaševo-Pavino Polje, from km 11 + 040 to km 22 + 380

Preparation of the construction project, preparation of preparatory works, works on the lower and upper machine within which excavations were carried out in the material of all categories in the amount of 65,866.56 m³ and works on the construction of embankments from materials of all categories in the amount of 35,139.58 m³, construction of the bridge , culverts and walls, installation of traffic. signalize. and road equipment, as well as all geodetic works.

  • Route length: 11,34 km
  • Total excavations: 66.767,11 m3
  • Total embankment: 57.109,61 m3
  • Quantity of concrete works: 6.232,78 m3

Investitor:

Direkcija za saobraćaj

Status:

Finished

Year:

2010 – 2011

Value of contracted works:

3.500.000 €