Reconstruction works on the part of the main road M-2, intersection Budva-Cetinje-Bečići

Reconstruction of part of the main road M-2, connection of two boulevards from Budva to Bečići with reconstruction of the intersection Budva-Cetinje-Bečići

Execution of construction and construction-craft works on: route, retaining walls, reinforced concrete structures, reinforced concrete gallery and staircase, traffic signals and equipment, atmospheric sewerage and observation of soil and buildings.

  • Route length: 0,7 km
  • Total excavations: 37.470,37 m3
  • Total embankment: 18.329,96 m3
  • Količina betonskih radova: 5.806,54 m3

Investor:

Direkcija za saobraćaj

Status:

Finished

Year:

2015 – 2016

Value of contracted works:

4.000.000 €