Reconstruction works on the main road m-2.3, Podgorica – Cetinje, section Ulići
Execution of works on the reconstruction of the main road m-2.3 Podgorica – Cetinje from km 12 + 500 to km 25 + 000, Ulići
Execution of construction and construction-craft works on: the route, retaining walls, drainage, traffic signals and road equipment, as well as all geodetic works.
- Route length: 12,5 km
- Total excavations: 38.850,13 m3
- Total embankment: 14.372,60 m3
- Quantity of concrete works: 140,45 m3
Investor:
Direkcija za saobraćaj
Status:
Finished
Year:
2015 – 2016
Value of contracted works:
2.500.000 €