Environmental reconstruction of Pljevlja Thermal Power Plant – block 1

Building area – 14.130,37 m2

Degree of completion of the object:

  • Earthworks – Excavation: 55.000 m3
  • Concrete and reinforced concrete works: 15.000 m3

Through this project, the working life of the Pljevlja Thermal Power Plant itself, whose participation in the energy balance of Montenegro is of great importance, would be extended. The Pljevlja Thermal Power Plant produces significant electricity, which is confirmed by the fact that its production represents a share of 35 percent of the total electricity production in Montenegro for the first ten months of 2021, as well as about 42 percent of the total electricity consumption for the same period. period in Montenegro – the document says.

Investor:

EPCG AD Nikšić

Status:

In progress

Year:

2022 –

Value of contracted works:

10.000.000 €

The goal of the project, as stated, is to adjust the operation of the Pljevlja Thermal Power Plant to the requirements of EU and Montenegrin legislation when it comes to industrial emissions for plants such as Thermal Power Plant, i.e. enabling the TE to continue its work in the next 15 years while meeting environmental standards.

The main expected result of the environmental reconstruction project is the continuation of the operation of the Pljevlja Thermal Power Plant for the next 15 years, but with the reduction of negative impacts on air, water and soil quality through the implementation of the best available techniques for preventing and controlling emissions that arise during the exploitation of the thermal power plant in compliance with EU and domestic regulations – he adds in the document.