Boulevard construction works Podgorica – Danilovgrad
The length of the road: 15 km
- Earthworks – Excavation: 869.882 m3 – urađeno 100%
- Earthworks – Embankment: 401.013 m3 – urađeno 100%
- Concrete and reinforced concrete works: 27.797 m3 – urađeno 100%
- Asphalt works: 107.555 t – urađeno 100%
Investor:
Uprava za saobraćaj
Status:
Finished
Year:
2020 – 2022
Value of contracted works:
24.500.000 €